|
|
|
 |
"Using DFMPro, we were able to reduce our time for checking the product design from
the manufacturing feasibility point of view by approximately 90% w.r.t. manual checking.
The net reduction in total time for checking of product design by using DFMPro software
is approximately 15%"
|
- Amol Mane
Manager, Engineering Dept.
Sulzer India Limited
|
|
|
|